Court Description: ORDER granting 38 Motion for Summary Judgment. Since this order effectively resolves the case, judgement will be entered in favor of Defendants. Signed by Judge Edward J. Davila on 12/7/2012. (ejdlc3, COURT STAFF) (Filed on 12/7/2012)

Download PDF
Teresi Investments v. City of Mountain View Doc. 69 1 2 3 4 5 6 7 UNITED STATES DISTRICT COURT 8 NORTHERN DISTRICT OF CALIFORNIA United States District Court For the Northern District of California 9 SAN JOSE DIVISION 10 11 TERESI INVESTMENTS III, a California Limited Partnership, 12 13 14 15 16 17 Plaintiff, v. CITY OF MOUNTAIN VIEW, a Municipal Corporation, and DOES 1–10, inclusive, Defendants. ) ) ) ) ) ) ) ) ) ) ) Case No.: 5:10-CV-04714 EJD ORDER GRANTING DEFENDANT’S MOTION FOR SUMMARY JUDGMENT [Re: Docket No. 38] Plaintiff Teresi Investments, III, a California Limited Partnership (“Plaintiff” or “Teresi”) 18 has brought an action seeking damages against Defendant, the City of Mountain View 19 (“Defendant” or “the City”), pursuant to 42 U.S.C. § 1983. Presently before the Court is 20 Defendant’s Motion for Summary Judgment, on which the Court held a hearing on September 28, 21 2012. Having fully considered the parties’ submissions and arguments, the Court GRANTS 22 Defendant’s Motion for Summary Judgment. 23 24 25 1. Background This action involves a dispute between a building developer (Plaintiff) and the City. City 26 officials denied Plaintiff construction permits, ordered Plaintiff to cease renovation and 27 construction plans, and disconnected water service to the site in question, among other actions. It is 28 1 Case No.: 5:10-CV-04714 EJD ORDER GRANTING DEFENDANT’S MOTION FOR SUMMARY JUDGMENT Dockets.Justia.com 1 Plaintiff’s contention—and the foundation of Plaintiff’s claims—that these and other acts have 2 amounted to violations of the Due Process and Equal Protection Clauses of the Fourteenth 3 Amendment to the U.S. Constitution. 4 5 1.1 Factual Background 6 Plaintiff is a California limited partnership that formerly owned property located at 291 Evandale in Mountain View, California (hereinafter “the property” or “the subject property”). Am. 8 Compl. ¶ 1. An apartment complex was located on the subject property which has also been known 9 United States District Court For the Northern District of California 7 as the Summer Hill Apartments. On December 12, 2006, the City of Mountain View City Council 10 (“City Council”) conditionally approved a plan to demolish the apartment complex and to construct 11 a 144-unit condominium complex in its place. See id. ¶ 7; Def.’s Request for Judicial Notice in 12 Supp. of Mot. for Summ. J. (“Def.’s RJN”), Exs. B, C. 13 By January 2008, all of the Summer Hill Apartment tenants had relocated, and the property 14 was fenced off and boarded up. In February 2008 city water service to the subject property was 15 discontinued. Decl. of Maryanne Achterberg in Supp. of Def.’s Mot. for Summ. J. ¶¶ 6–8 & Exs. 16 A, B. In addition, in March 2008, with Plaintiff’s permission, the subject property was used for 17 SWAT Team training, which included the detonation of several explosive charges placed 18 throughout the property. Decl. of Chris Hsiung in Supp. of Def.’s Mot. for Summ. J. ¶¶ 2–6. 19 The redevelopment project, however, faced an obstacle, namely in the form of funding 20 problems. Around July 15, 2008, Salvatore Caruso (“Caruso”), a developer working with and on 21 behalf of Plaintiff, contacted former City of Mountain View City Attorney Michael Martello 22 (“Martello”) and expressed concerns about obtaining funding for the project. Decl. of Michael 23 Martello in Supp. of Def.’s Mot. for Summ. J. ¶¶ 4–5, Ex. A. Caruso also inquired about an 24 extension for the permit, which was set to expire on December 12, 2008. Id. By August, Plaintiff 25 began seeking to reactivate the residential use of the property until it could proceed with the 26 redevelopment. Norman Matteoni (“Matteoni”), Plaintiff’s counsel in this action, exchanged emails 27 and letters with Martello inquiring whether Plaintiff could reactivate the property for residential 28 2 Case No.: 5:10-CV-04714 EJD ORDER GRANTING DEFENDANT’S MOTION FOR SUMMARY JUDGMENT 1 use until the overhaul project could commence once funding was secured. See Decl. of Salvatore 2 Caruso in Supp. of Pl.’s Opp’n to Def.’s Mot. for Summ. J., Exs. B, C. No definitive answer was 3 given by Martello as to these inquiries. Id. 4 Martello had visited the property on several occasions around this time and concluded that, given the property’s condition, it would, at a minimum, need to be inspected before permits could 6 be issued to make the property habitable again. See id., Ex. F. This assessment was communicated 7 to Matteoni via email as well as during a meeting between City officials and Plaintiff’s 8 representatives that took place on August 18, 2008. Id.; Martello Decl. ¶ 14. At this meeting, the 9 United States District Court For the Northern District of California 5 City officials also explained to Plaintiff’s representatives that Development Review was required 10 for the proposed renovation project due to the extent of the changes to the property since it was last 11 inhabited by tenants. Id. Additionally, the City officials denied Plaintiff’s request to reestablish 12 water service to the property. Id. 13 On October 17, 2008 and October 27, 2008, JNSJ Roofing Inc. submitted an online 14 application for a re-roofing permit for the subject property through the City’s e-permit system on 15 behalf of Plaintiff. Decl. of Shellie Woodworth in Supp. of Def.’s Mot. for Summ. J. ¶¶ 16–17. By 16 the time these applications were submitted, Plaintiff had not scheduled a property inspection or 17 submitted its renovation plans for Development Review. Martello Decl. ¶ 28. On October 28, a 18 stop-work notice was issued as to the subject property because it had become apparent to City 19 officials that Plaintiff had begun renovation earlier in the month. See Martello Decl. ¶¶ 17, 28. On 20 October 29, 2008, the re-roofing permit applications were cancelled. Woodworth Decl. ¶¶ 4–7, 18. 21 During the week of November 17, 2008, City building inspectors conducted an inspection 22 of the subject property. They summarized their findings in a Code Inspection Report dated 23 December 1, 2008, which outlined all of the problems with the property that fell short of various 24 building code sections. See Caruso Decl., Ex. N. On December 9, 2008, City officials again met 25 with Plaintiff’s representatives; the officials explained that Development Review was required 26 before renovation of the property or reactivation of residential use could be approved. Martello 27 Decl. ¶ 24. 28 3 Case No.: 5:10-CV-04714 EJD ORDER GRANTING DEFENDANT’S MOTION FOR SUMMARY JUDGMENT 1 On December 16, 2008, Martello discovered that water service had been mistakenly 2 reestablished at the subject property. Martello Decl. ¶ 25. On that same date he directed that the 3 water service be disconnected. Id. 4 In March 2009, Plaintiff retained AEI Consultants to conduct a habitability survey, a property condition assessment, and a preliminary mold and moisture survey for the subject 6 property. Declaration of Randy Tsuda in Supp. of Def.’s Mot. for Summ. J. ¶ 28. AEI Consultants’ 7 report gave the assessment that the property was in “poor” overall condition. Id., Ex. C at ii. The 8 report was inconclusive as to whether the property was in compliance with building and fire codes. 9 United States District Court For the Northern District of California 5 Id., Ex. C at i. 10 On August 21, 2009, Plaintiff submitted another application for a re-roofing permit for the 11 subject property through the City’s e-permit system. Woodworth Decl. ¶ 20. By this date 12 Development Review of the site had not been conducted or scheduled. On August 25, 2009, this re- 13 roofing permit application was cancelled. Id. ¶ 21. Plaintiff filed an appeal of this cancellation with 14 the City Council on August 21; a public hearing regarding this appeal was held on October 27, 15 2009. Def.’s RJN, Ex. D. After consideration of this evidence, the City Council adopted Resolution 16 17440, which upheld the City officials’ cancellation of the permit application. See id. 17 The subject property was subsequently sold to a new owner, Bay West. The new owner was 18 granted building permits after it submitted its renovation plans through the City’s Development 19 Review process. See Def.’s RJN Exs. F–H. 20 21 1.2 Procedural History 22 On October 4, 2010, Plaintiff filed a Complaint against the City in Santa Clara County 23 Superior Court. See Notice of Removal, Docket Item No. 1, Ex. A. The City removed the action to 24 this Court on October 19, 2010 on the basis that this Court has original jurisdiction under 42 U.S.C. 25 § 1331 as the complaint alleges violations of the Fourteenth Amendment to the U.S. Constitution 26 and the causes of action arise under 42 U.S.C. § 1983. See 28 U.S.C. § 1441(b); Notice of Removal 27 ¶¶ 3–5. 28 4 Case No.: 5:10-CV-04714 EJD ORDER GRANTING DEFENDANT’S MOTION FOR SUMMARY JUDGMENT 1 On June 7, 2011, Plaintiff filed an Amended Complaint with this Court. See Am. Compl., 2 Docket Item No. 21. The Amended Complaint consists of two causes of action. In the First Cause 3 of Action, Plaintiff asserts that Defendant’s actions violated Plaintiff’s rights under the Due 4 Process Clause of the Fourteenth Amendment. In the Second Cause of Action, Plaintiff asserts that 5 Defendant’s conduct also constitutes a violation of the Fourteenth Amendment’s Equal Protection 6 Clause. 7 On July 12, 2011, the City issued its Answer to the Amended Complaint and also filed a Counterclaim against Plaintiff for breach of contract, violation of Mountain View municipal code, 9 United States District Court For the Northern District of California 8 and quantum meruit. See Answer and Countercl., Docket Item No. 25. 10 On May 18, 2012, the City filed the present Motion for Summary Judgment. See Docket 11 Item No. 38. Oral arguments before the Court took place on September 28, 2012. See Docket Item 12 No. 65. 13 14 15 2. Standard of Review A motion for summary judgment should be granted if “there is no genuine dispute as to any 16 material fact and the movant is entitled to a judgment as a matter of law.” Fed. R. Civ. P. 56(a); 17 Addisu v. Fred Meyer, Inc., 198 F.3d 1130, 1134 (9th Cir. 2000). The moving party bears the 18 initial burden of informing the court of the basis for the motion and identifying the portions of the 19 pleadings, depositions, answers to interrogatories, admissions, or affidavits that demonstrate the 20 absence of a triable issue of material fact. Celotex Corp. v. Catrett, 477 U.S. 317, 323 (1986). 21 If the moving party meets this initial burden, the burden then shifts to the non-moving party to go 22 beyond the pleadings and designate “specific facts showing that there is a genuine issue for trial.” 23 Fed. R. Civ. P. 56(e); Celotex, 477 U.S. at 324. The court must regard as true the opposing party's 24 evidence, if supported by affidavits or other evidentiary material. Celotex, 477 U.S. at 324. 25 However, the mere suggestion that facts are in controversy, as well as conclusory or speculative 26 testimony in affidavits and moving papers, is not sufficient to defeat summary judgment. See 27 Thornhill Publ’g Co. v. GTE Corp., 594 F.2d 730, 738 (9th Cir. 1979). Instead, the non-moving 28 5 Case No.: 5:10-CV-04714 EJD ORDER GRANTING DEFENDANT’S MOTION FOR SUMMARY JUDGMENT 1 party must come forward with admissible evidence to satisfy the burden. Fed. R. Civ. P. 56(c); see 2 also Hal Roach Studios, Inc. v. Feiner & Co., Inc., 896 F.2d 1542, 1550 (9th Cir. 1990). 3 A genuine issue for trial exists if the non-moving party presents evidence from which a reasonable jury, viewing the evidence in the light most favorable to that party, could resolve the 5 material issue in his or her favor. Anderson v. Liberty Lobby, Inc., 477 U.S. 242, 248–49 (1986); 6 Barlow v. Ground, 943 F.2d 1132, 1134–36 (9th Cir. 1991). Conversely, summary judgment must 7 be granted where a party “fails to make a showing sufficient to establish the existence of an 8 element essential to that party’s case, on which that party will bear the burden of proof at trial.” 9 United States District Court For the Northern District of California 4 Celotex, 477 U.S. at 322. 10 11 12 3. Discussion The City’s conduct which underlies Plaintiff’s Complaint consists essentially of the denials 13 of the re-roofing permits and the discontinuation of the reconnected water service. Plaintiff 14 contends that these actions have amounted to violations of its Due Process and Equal Protection 15 rights under the Fourteenth Amendment. Defendant’s Motion for Summary Judgment, on the other 16 hand, argues that the City’s actions have not risen to the level of Due Process or Equal Protection 17 violations. The Court will herein address the Defendant’s arguments and whether Plaintiff’s causes 18 of action can withstand summary judgment. 19 20 3.1 Due Process 21 Section 1 of the Fourteenth Amendment provides that no state shall “deprive any person of 22 life, liberty, or property, without due process of law.” U.S. Const. amend. XIV, § 1. Plaintiff bases 23 its First Cause of Action on both the procedural and substantive aspects of the Due Process Clause. 24 25 26 27 3.1.1 Procedural Due Process To establish a § 1983 claim based on a violation of procedural due process, a plaintiff must establish (1) a protected liberty or property interest, and (2) a denial of adequate procedural 28 6 Case No.: 5:10-CV-04714 EJD ORDER GRANTING DEFENDANT’S MOTION FOR SUMMARY JUDGMENT protection. Pinnacle Armor, Inc. v. United States, 648 F.3d 708, 716 (9th Cir. 2011). The 2 fundamental requirement of procedural due process is the opportunity to be heard “at a meaningful 3 time and in a meaningful manner.” Mathews v. Eldridge, 424 U.S. 319, 333 (1976) (internal 4 quotation marks and citation omitted). To determine whether the City provided Plaintiff adequate 5 opportunity to be heard, the Court must balance: (1) the private interest that will be affected by the 6 action; (2) the risk of an erroneous deprivation of that interest through the procedures used and the 7 value of additional or alternative safeguards; and (3) the government’s interest, including the 8 additional costs and administrative burdens that additional procedures would entail. Buckingham v. 9 United States District Court For the Northern District of California 1 Sec’y of U.S. Dep’t of Agr., 603 F.3d 1073, 1081–82 (9th Cir. 2010) (citing Mathews, 424 U.S. at 10 335). “At bottom, the due process evaluation ‘is flexible and calls for such procedural protections 11 as the particular situation demands.’” Id. at 1083 (quoting Mathews, 424 U.S. at 334). 12 In applying the balancing test to the facts and issues of this case, the Court first recognizes 13 that both the City and Plaintiff have significant interests at stake. While not making a determination 14 on whether the re-roofing permit is a constitutionally protected property interest for Due Process 15 Clause purposes, the Court recognizes that a real estate development and investment entity like 16 Plaintiff has a strong interest in obtaining such permits so as to develop the property it owns or 17 manages. At the same time, the Court also acknowledges the City’s substantial interest in 18 regulating construction and development projects as a matter of public safety. See Hodel v. Va. 19 Surface Min. and Reclamation Ass’n, Inc., 452 U.S. 264, 300 (1981) (“Protection of the health and 20 safety of the public is a paramount governmental interest which justifies summary administrative 21 action. Indeed, deprivation of property to protect the public health and safety is [o]ne of the oldest 22 examples of permissible summary action.” (internal quotation marks omitted)). 23 With these interests in mind, the Court turns to the “the fairness and reliability of the 24 existing . . . procedures, and the probable value, if any, of additional procedural safeguards.” 25 Mathews, 424 U.S. at 343. A review of record shows that the City’s procedures for denying the re- 26 roofing permits, as well as the pre- and post-deprivation processes that were afforded to Plaintiff, 27 are fair. See Buckingham, 603 F.3d at 1084 (concluding that where a plaintiff is given adequate 28 7 Case No.: 5:10-CV-04714 EJD ORDER GRANTING DEFENDANT’S MOTION FOR SUMMARY JUDGMENT 1 notice of the potential cancellation of a permit and the opportunity for post-cancellation review, the 2 requirements for procedural due process has been satisfied). 3 The City of Mountain View Municipal Code (hereinafter “MVMC”) refers to the Development Review process by which building construction and modification projects are 5 assessed. See Def.’s RJN, Ex. J (listing code sections that illustrate the process which developers 6 must undergo in order to proceed with construction and renovation projects). The Development 7 Review process is part of the assessment of whether construction and residential use permits will 8 be issued. Id. For example, the Code makes clear that “Development Review is required for all new 9 United States District Court For the Northern District of California 4 construction, modifications to building exteriors or Development Sites, and changes in Land Use 10 11 12 13 . . . .” MVMC § A36.52.020. The Code states that Development review can be a separate permit application or part of a larger permit application as described in this section. The zoning administrator shall have the overall authority to conduct development review, subject to appeal to the city council, but may refer applications to other community development department staff for review and issuance of permits. 14 15 MVMC § A36.52.040. Code sections like these indicate that when developers apply for permits 16 through the procedures set forth in the Code, whether the project will be subject to Development 17 Review is an issue left to the City’s discretion. Id.; see also id. § A36.52.010 (describing the 18 Development Review process as “discretionary” for the City to determine whether a proposed 19 development project will, as an example, comply with city safety requirements and policies). The 20 Code states that conditional permits may be issued subject to the results of the Development 21 Review assessment. Id. § A36.52.040. And finally, the Code explicitly allows for decisions about 22 Development Review or denials of construction permits are subject to appeal to the City Council. 23 See id. Post-deprivation review is also available to parties also via a writ of mandate under 24 California Code of Civil Procedure § 1094.6 as well as via a state law tort action. 25 In the case before the Court, Plaintiff’s re-roofing permit application was twice denied or 26 cancelled: in October 2008 and August 2009. The Court finds that, consistent with the 27 aforementioned and other MVMC sections, Plaintiff was indeed afforded reasonable notice of the 28 8 Case No.: 5:10-CV-04714 EJD ORDER GRANTING DEFENDANT’S MOTION FOR SUMMARY JUDGMENT 1 possible cancellation of the permits and a meaningful opportunity to be heard both before and after 2 the cancellations. 3 Regarding the October 2008 cancellation: the undisputed facts in the record show that 4 proper and fair procedures were followed in denying Plaintiff’s permit applications. Before 5 Plaintiff applied for the permit, City officials informed Plaintiff’s representatives that due to the 6 questionable status of the subject property and extent of the proposal to reactivate residential use, 7 Development Review might be a necessary condition for the permit approval process. The 8 following are examples of such communications: United States District Court For the Northern District of California 9 • “[T]he real issue is probably whether the structure is nonconforming. . . . Until we visit 10 the site, it is impossible to know for sure . . . . It is largely a factual inquiry at this point.” 11 Email from Martello to Matteoni dated Aug. 4, 2008 2:26 PM. Caruso Decl., Ex. A–G. 12 • “As to reactivating the property as a residential use, [i]t would, as a minimum need to be 13 inspected and a determination made if we could even issue the permits to make it 14 habitable again. If we can issue permits (repair vs rebuilding) and if it meets current 15 zoning, the [City] Council may need to approve it.” Email from Martello to Matteoni 16 dated Aug. 11, 2008, 7:26 PM. Caruso Decl., Ex. F. 17 • At a meeting on August 18, 2008, Martello and other City representatives told Matteoni, 18 Caruso, and other of Plaintiff’s representatives that the subject property and project site 19 would need to be reviewed and approved through the City’s Development Review 20 process before reactivation of residential use or the renovation project could commence. 21 Martello Decl. ¶¶ 11–12. Martello also enumerated the problems with the property that 22 posed safety hazards, the remedy of which would be necessary to pass Development 23 Review. Id. ¶ 13. Matteoni acknowledged this discussion in a letter to Martello dated 24 August 19, 2008. Id., Ex. C. 25 Before submitting applications for the re-roofing permits in October 2008, Plaintiff had not 26 scheduled a property inspection or submitted its renovation plans in accordance with the 27 Development Review procedure. Martello Decl. ¶ 28. Consistent with the permit authorization 28 9 Case No.: 5:10-CV-04714 EJD ORDER GRANTING DEFENDANT’S MOTION FOR SUMMARY JUDGMENT 1 procedures and with the statements made by Martello and other City representatives, these permit 2 applications were cancelled. Plaintiff did not challenge the permit application cancellation by 3 appeal to the City Council despite having an opportunity to do so at its disposal. 4 With regard to the August 2009 cancellation, the facts in the record also show that Plaintiff 5 and its representatives were given a meaningful opportunity to be heard. The following is a non- 6 exhaustive list of facts taken from the record showing that Plaintiff was on notice that the subject 7 property might still not pass Development Review, which would likely cause another permit 8 application to be cancelled: United States District Court For the Northern District of California 9 • The Code Inspection Report dated December 1, 2008 outlined all of the problems with the 10 subject property discovered during a site inspection by city inspectors that took place 11 during the week of November 17, 2008. See Caruso Decl. Ex. N. 12 • In a letter dated December 2, 2008, City of Mountain View Director of Community 13 Development Randal R. Tsuda (“Tsuda”) explained to Caruso that due to the various code 14 violations discovered during the November inspection, the City required Plaintiff to 15 undergo further site assessments and evaluations. Id., Ex. O. This letter also iterated 16 Martello’s assertion that Plaintiff would be required to undergo Development Review 17 before permits could be issued. Id. 18 • On December 9, 2008, members of the City staff, including Martello and Tsuda, met with 19 Caruso and other of Plaintiff’s representatives. Martello Decl. ¶ 23; Tsuda Decl. ¶ 26. At 20 this meeting, the City representatives explained that because changes had been made to 21 the subject property since it was last inhabited, Development Review was required before 22 the property could be safely re-occupied by residential tenants. Martello Decl. ¶ 24; Tsuda 23 Decl. ¶ 27. 24 Again, before submitting its application for the re-roofing permits on August 21, 2009, Plaintiff did 25 not arrange for its property to undergo Development Review. For similar reasons as the October 26 2008 cancellation, the City cancelled Plaintiff’s second application for a re-roofing permit on 27 August 25, 2009. 28 10 Case No.: 5:10-CV-04714 EJD ORDER GRANTING DEFENDANT’S MOTION FOR SUMMARY JUDGMENT 1 After this cancellation, Plaintiff was afforded the meaningful opportunity to challenge the cancellation by appealing to the City Council. A public hearing of the appeal took place on October 3 27, 2009, where Plaintiff was able to present evidence in support of its appeal. See Decl. of John. 4 F. Livingstone in Supp. of Pl.’s Opp’n to Mot. for Summ. J., Ex. F. After consideration of this 5 evidence, the City Council adopted Resolution 17440 which upheld the City officials’ cancellation 6 of the permit application. See Def.’s RJN, Ex. D. The City Council explained that the rationale 7 behind its affirmation included, but was not limited to, the following reasons: the property was 8 uninhabitable and unsafe due to illegal modifications; significant exterior improvements were 9 United States District Court For the Northern District of California 2 needed to make the units habitable again; and Plaintiff had failed to undergo the City’s 10 11 Development Review Process despite being informed that such a process was necessary. Id. As for the disconnection of the water, Plaintiff contends that Martello’s ordering of the 12 water service to be discontinued was arbitrary and therefore in violation of its procedural due 13 process rights. The Court disagrees. The water was reconnected in error after Plaintiff’s requests 14 for reconnection were denied by the City multiple times. The water was initially disconnected 15 when the property was not in use and preparations for demolition and reconstruction were being 16 made. Plaintiff’s requests to re-activate the property for residential use were repeatedly denied after 17 the City decided that reconnecting the water might lead to residential use of the property which had 18 been determined to be unsafe for such residential use. There were no residents legally inhabiting 19 the property at the time Martello made the decision to disconnect the erroneously-connected water 20 supply. Accordingly this decision did not violate Plaintiff’s due process rights. See Kawaoka v. 21 City of Arroyo Grande, 17 F.3d 1227, 1237 (9th Cir. 1994). 22 In sum, viewing all the opportunities given to Plaintiff and its representatives to anticipate, 23 challenge, and appeal the cancellation of the permits and the disconnection of the water, the Court 24 cannot conclude that the City deprived Plaintiff of the meaningful opportunity to be heard. As 25 such, the Court finds that there was no violation of procedural due process. 26 27 Because this Court concludes that the City complied with the due process requirement of adequate procedural protection, the Court will not reach the question of whether Plaintiff has a 28 11 Case No.: 5:10-CV-04714 EJD ORDER GRANTING DEFENDANT’S MOTION FOR SUMMARY JUDGMENT 1 constitutionally protected property interest in obtaining the re-roofing permits or water service to 2 the property. 3 4 3.1.2 Substantive Due Process The Constitution’s substantive due process guarantee protects an individual from arbitrary 6 government action. See Cnty. of Sacramento v. Lewis, 523 U.S. 833, 845–46 (1998). Substantive 7 due process is violated by “executive abuse of power . . . which shocks the conscience.” Id. at 846; 8 accord Costanich v. Dep’t of Soc. and Health Servs., 627 F.3d 1101, 1111 (9th Cir. 2010). “When 9 United States District Court For the Northern District of California 5 executive action like a discrete permitting decision is at issue, only ‘egregious official conduct can 10 be said to be arbitrary in the constitutional sense’: it must amount to an ‘abuse of power’ lacking 11 any ‘reasonable justification in the service of a legitimate governmental objective.’” Shanks v. 12 Dressel, 540 F.3d 1082, 1088 (9th Cir. 2008) (quoting Lewis, 523 U.S. at 846). Legislative acts 13 that do not impinge on fundamental rights or employ suspect classifications are presumed valid, 14 and this presumption is overcome only by a “clear showing of arbitrariness and irrationality.” 15 Hodel v. Indiana, 452 U.S. 314, 331–32 (1981); see also Kadrmas v. Dickinson Public Schools, 16 487 U.S. 450, 462 (1988). 17 In a substantive due process challenge, the Ninth Circuit has instructed that courts should 18 not require that the City’s legislative acts actually advance its stated purposes, but instead look to 19 whether “the governmental body could have had no legitimate reason for its decision.” Levald, Inc. 20 v. City of Palm Desert, 998 F.2d 680, 690 (9th Cir. 1993) (internal quotation marks omitted). The 21 City’s general plan or course of action does not violate substantive due process as long as it 22 advances any legitimate public purpose, Construction Indus. Ass’n v. Petaluma, 522 F.2d 897, 906 23 (9th Cir. 1975), and if it is “at least fairly debatable” that the decision was rationally related to 24 legitimate governmental interests, the City’s actions must be upheld. Christensen v. Yolo County 25 Bd. of Supervisors, 995 F.2d 161, 165 (9th Cir.1993) (citations omitted). 26 In accordance with these standards, the Court finds that Plaintiff has failed to put forth 27 sufficient evidence suggesting that the City lacked any reasonable justification to deny the re- 28 12 Case No.: 5:10-CV-04714 EJD ORDER GRANTING DEFENDANT’S MOTION FOR SUMMARY JUDGMENT roofing permits so as to withstand the Defendant’s Motion for Summary Judgment. As noted, the 2 City has at the very least a legitimate interest in issuing permits for projects that involve 3 construction, renovation, and re-activation of habitability as a matter of public health and safety. 4 Plaintiff failed to undergo Development Review, which, in accordance with the MVMC, the City 5 had determined would be necessary so that Plaintiff could proceed with its renovation or re- 6 habilitation projects. The City’s actions included the following: meeting with Plaintiff’s 7 representatives regarding the proposed construction project, explaining to Plaintiff’s 8 representatives the process of Development Review, inspecting the subject property on several 9 United States District Court For the Northern District of California 1 occasions, enumerating the property’s health and safety deficiencies, and providing Plaintiff post- 10 deprivation review in the form of an appeal before the City Council. These decisions based on 11 these actions cannot be characterized as “arbitrary” or “irrational,” nor do they “shock the 12 conscience” of the Court. 13 With regard to the disconnection of the water service, the Court also finds no substantive 14 due process violation. As noted, Plaintiff’s requests to reconnect the water were denied time and 15 time again because the City determined that the subject property was vacant and uninhabitable in 16 accordance with City codes and regulations. The water was disconnected, the City suggests, 17 because it was reconnected to the subject property in error. The Court concludes that this 18 determination could have been related to the City’s interest in regulating construction and 19 renovation projects as a matter of public health and safety. 20 Plaintiff contends that the City’s public-safety rationale was a mere pretext for what it 21 asserts was the real reason behind the City’s actions: to “recoup money and appease the neighbors 22 who were objecting to the reopening of the Property to low income tenants.” Pl.’s Opp’n to Mot. 23 for Summ. J., at 9–10. Plaintiff, however, has not presented sufficient evidence to support this 24 notion so as to withstand a summary judgment motion. The Court also notes that, contrary to 25 Plaintiff’s contention, consideration of community concerns vis-à-vis a proposed development 26 project has been recognized as a legitimate rationale. See, e.g., Nelson v. City of Selma, 881 F.2d 27 836, 839 (9th Cir. 1989) (“The opposition of neighbors to a development project is also a 28 13 Case No.: 5:10-CV-04714 EJD ORDER GRANTING DEFENDANT’S MOTION FOR SUMMARY JUDGMENT legitimate factor in legislative decisionmaking.”); Stubblefield Constr. Co. v. City of San 2 Bernardino, 32 Cal. App. 4th 687 (1995) (holding that city councilmembers could—and in fact 3 may be supposed to—take into consideration concerns voiced by their constituents about proposed 4 construction projects in their vicinity). Moreover, and ultimately fatal to its contention of a pretext, 5 Plaintiff has not presented any evidence that the City’s actions were not based, at least in part, on a 6 concern for public health and safety. As shown above, the City has presented sufficient evidence 7 demonstrating that it was at least rational to conclude that allowing Plaintiff to proceed with its 8 development plans would violate the municipal code and pose a health and safety risk. Plaintiff has 9 United States District Court For the Northern District of California 1 not presented sufficient evidence to rebut this. 10 In addressing Plaintiff’s substantive due process claim, the Court is “reluctant to minutely 11 scrutinize the legislative processes of the City in the manner proposed by plaintiffs.” Stubblefield, 12 32 Cal. App. 4th at 712. Since there is a rational basis for the City’s decision, the Due Process 13 Clause of the Fourteenth Amendment is not implicated by a “run of the mill dispute between a 14 developer and a town planning agency, regardless of [the developer’s] characterizations of it and of 15 defendants’ alleged mental states, to rise to the level of a due process violation.” Id. The Court has 16 not nor will not examine the utility of the City’s legislative and administrative decisions; rather the 17 Court has only determined that the City could have had legitimate reasons for those decision. See 18 Levald, 998 F.2d at 690. 19 Accordingly, because the City’s actions could have been rationally related to its legitimate 20 interest in public health and safety, the Court finds that the City did not violate Plaintiff’s 21 substantive due process rights. 22 23 3.2 Equal Protection 24 The Court now turns to Defendant’s Motion for Summary Judgment with regard to 25 Plaintiff’s Second Cause of Action: a claim of a violation of the Fourteenth Amendment’s Equal 26 Protection Clause. The Equal Protection Clause guarantees that “No state shall . . . deny to any 27 person within its jurisdiction the equal protection of the laws.” U.S. Const. amend. XIV, § 1. 28 14 Case No.: 5:10-CV-04714 EJD ORDER GRANTING DEFENDANT’S MOTION FOR SUMMARY JUDGMENT 1 Plaintiff’s Equal Protection claim is based on the “class of one” theory—that Plaintiff was singled 2 out by the City and treated differently from other, similarly situated real estate developers. To 3 succeed on this “class of one” claim, Plaintiff must demonstrate that the City intentionally treated 4 Plaintiff differently than other similarly situated property owners, and did so without a rational 5 basis. Gerhart v. Lake Cnty., Montana, 637 F.3d 1013, 1022 (9th Cir. 2011). 6 In support of its claim, Plaintiff points to the fact that the City issued building permits to the subsequent owner of the subject property, Bay West. This disparate treatment, Plaintiff argues, is 8 sufficient for a prima facie Equal Protection claim. The Court disagrees. While Plaintiff and Bay 9 United States District Court For the Northern District of California 7 West may be similarly situated parties, Plaintiff has failed to sufficiently show that they were 10 treated differently. Bay West obtained approval of its renovation plans for the subject property 11 through the City’s Development Review process. See Def.’s RJN, Exs. E, F, G. As noted, the 12 Development Review condition was also placed on Plaintiff’s request for permits. Like Plaintiff, 13 Bay West was not issued building permits without undergoing the Development Review process. 14 Decl. of Randy Tsuda in Supp. of Reply to Pl.’s Opp’n ¶ 8 (“We did not issue any building permit 15 to Bay West before City Council approved the Development Review permit.”). Unlike Plaintiff, 16 Bay West applied for Development Review, which was ultimately approved. Id. ¶ (“Once 17 [Development Review] approval was obtained, we were able to issue a building permit to Bay 18 West.”). The City’s denial of Plaintiff’s permit application and granting Bay West’s cannot be 19 characterized as irrational or arbitrary. 20 21 Accordingly, the Court finds that Plaintiff has failed to present an Equal Protection claim sufficient to withstand a motion for summary judgment. 22 23 24 25 4. Conclusion and Order For the aforementioned reasons Defendant’s Motion for Summary Judgment is GRANTED in its entirety. 26 27 28 15 Case No.: 5:10-CV-04714 EJD ORDER GRANTING DEFENDANT’S MOTION FOR SUMMARY JUDGMENT 1 Since this Order effectively resolves this case, all previously-set deadlines and hearings, 2 including the trial dates, are VACATED. Judgment shall be entered in favor of Defendant, and the 3 clerk shall close this file. 4 5 IT IS SO ORDERED. 6 Dated: December 7, 2012 7 8 _________________________________ EDWARD J. DAVILA United States District Judge United States District Court For the Northern District of California 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 16 Case No.: 5:10-CV-04714 EJD ORDER GRANTING DEFENDANT’S MOTION FOR SUMMARY JUDGMENT

Some case metadata and case summaries were written with the help of AI, which can produce inaccuracies. You should read the full case before relying on it for legal research purposes.

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.