Notice: This opinion is subject to formal revision before publication in the Atlantic and Maryland
Reporters. Users are requested to notify the Clerk of the Court of any formal errors so that
corrections may be made before the bound volumes go to press.
DISTRICT OF COLUMBIA COURT OF APPEALS
No. 03-CV-1271
DONNA L. WILLIAMS, APPELLANT ,
V.
DISTRICT OF COLUMBIA , et al., APPELLEES.
Appeal from the Superior Court of the
District of Columbia
(CA5079-99)
(Hon. A. Franklin Burgess, Jr., Trial Judge)
(Argued December 7, 2005
Decided June 22, 2006)
Donna M. Doblick, with whom Edward J. McAndrew was on the brief, for appellant.
James C. McKay, Jr., Senior Assistant Attorney General, with whom Robert J. Spagnoletti,
Attorney General for the District of Columbia, and Edward E. Schwab, Deputy Attorney General,
were on the brief, for appellees.
Before SCHWELB and FARRELL, Associate Judges, and NEBEKER, Senior Judge.
Opinion for the court by Senior Judge NEBEKER.
Concurring opinion by Associate Judge SCHWELB at p. 10.
Separate statement of Senior Judge NEBEKER at p. 15.
I.
NEBEKER, Senior Judge: The Consumers United Insurance Company (“CUIC”) appeals the
Superior Court’s decision to grant appellee District of Columbia’s motion for summary judgment.
2
CUIC argues that the District of Columbia defrauded CUIC when the parties entered into an
agreement in which the District’s agents lacked the authority to bind the District. We detect no error,
and therefore, affirm.
II.
In 1985, CUIC entered into a “Tri-Party Agreement” (“the Agreement”) with the District of
Columbia’s Department of Housing and Community Development (“DHCD”) and the Trust for
Public Land (“TPL”) in order to carry out what the parties called the Parkside Project. The
Agreement provided that TPL would purchase a parcel of land in Northeast Washington to prepare
for sale to a developer. CUIC would loan TPL the funds to buy the property. Paragraph 3(e) of the
Agreement contained a provision whereby, upon CUIC’s demand, but no sooner than 18 months
after the Agreement was signed, the District was required to purchase the CUIC Note and the CUIC
Deed of Trust (“the Note and Deed”), and retake title to the property.1 To this end, ¶ 5(c) of the
1
Paragraph 3(e) provided the following:
Notwithstanding any other provision of this Paragraph 3, CUIC may
(i) upon the expiration of eighteen (18) months from the effective
date of this Agreement (and regardless of whether or not a final
development plan has been approved as provided in subparagraph
2(e) of this Agreement) and (ii) at any time mutually agreed by CUIC
and DHCD, require the purchase by DHCD of the CUIC Note and the
CUIC Deed of Trust for an amount equal to the total amount then
secured by the CUIC Deed of Trust less any amount advanced by
CUIC pursuant to subparagraph 2(d) of this Agreement (for
development planning purposes). DHCD agrees that it will purchase
such CUIC Note and CUIC Deed of Trust for such amount within
thirty (30) days of its receipt of written notice from CUIC that CUIC
is requiring such purchase. Immediately upon DHCD’s purchase of
(continued...)
3
Agreement (“the express warranty”) explicitly provided that DHCD had set aside funds for the
project, that it had the authority to enter such an agreement, and that performance of the Agreement
would not violate any laws.2 DHCD also represented to CUIC separately that it had the authority
to enter into the Agreement, that the Agreement was legal and enforceable, and that its performance
1
2
(...continued)
the CUIC Note and CUIC Deed of Trust as provided in this
subsection 3(e), TPL shall transfer and convey the Property (or so
much thereof as has not been previously conveyed) to DHCD in
exchange for the release of the CUIC Note, the CUIC Deed of Trust,
the DHCD Note, and the DHCD Deed of Trust.
Paragraph 5(c) provided the following:
(1) This Agreement and the DHCD Deed of Trust have been duly
authorized and constitute valid and legally binding obligations
enforceable against it in accordance with their terms, except as
limited by bankruptcy or other similar laws relating to or affecting the
enforcement of creditors’ rights;
(2) There is no action or proceeding pending or threatened, known to
it, which questions the validity or the prospective validity of this
Agreement or the DHCD Deed of Trust insofar as such validity
relates to its authority, or any essential element upon which this
Agreement depends, or any action to be taken by it pursuant to this
Agreement or in connection with the present transactions; and
(3) Insofar as its capacity to carry out any obligation under this
Agreement or the DHCD Deed of Trust is concerned, its execution of,
and performance pursuant to, the provisions of such documents and
instruments will not result in the breach or violation of any provision
of any statute, regulation, agreement, judgment, or decree to which it
is subject; and
(4) Insofar as legally required, it has committed sufficient funds to
satisfy its obligations under this Agreement and will insure that such
funds remain available for such purpose until required to be expended
in accordance with the provisions hereof or until such obligations are
otherwise satisfied or discharged.
4
would not violate any law. Madeleine Petty, who at the time was director of DHCD, made specific,
written representations to CUIC that the District had committed sufficient funds to perform its
obligations under the Agreement. In 1989, David Dennison (who had by then assumed directorship
of DHCD) executed an addendum to the Agreement, ratifying the Agreement’s original provisions.
In July 1996, CUIC expressed its desire to invoke ¶ 3(e). Only then did DHCD convey its
belief that ¶ 3(e) was unenforceable, and that the funds had never, in fact, been set aside in the
DHCD annual appropriations in 1985 or ensuing annual appropriations to purchase the Note and
Deed.3 However, CUIC did not attempt to formally exercise its rights under ¶ 3(e) until February
1999, at which time DHCD refused, claiming that the Agreement was unenforceable.
In July 1999, Donna Williams, as receiver for CUIC, filed a complaint in Superior Court
against the District. The complaint contained fourteen counts, including fraud. The District moved
to dismiss, on the grounds that CUIC did not comply with the provisions of D.C. Code § 12-309,
requiring that tort claimants wishing to sue the District send a letter to the Mayor within six months
of the injury, setting forth certain information. The trial court denied the motion.
Both parties then made motions for summary judgment. The trial court found that the
provisions in question violated 31 U.S.C. § 1341 (2003) (often referred to as the Anti-Deficiency
Act), and were therefore void ab initio. The court further rejected CUIC’s claim of fraud, concluding
in light of settled law that, under the circumstances, CUIC could not reasonably rely on promises by
3
During discovery, both Petty and Dennison admitted that they never had any inkling as to
whether the District had allocated funds to purchase the Note and Deed, if CUIC had so demanded.
5
District officials. “Nothing,” the court added, “prevented CUIC from demanding evidence of an
appropriation covering the [District’s contractual commitment] before entering into the transaction.”
The court, therefore, held in favor of the District. CUIC appealed, but only as to the fraud claim.
III.
We review orders granting summary judgment de novo. Tobin v. John Grotta Co., 886 A.2d
87, 89 (D.C. 2005). The standard on appeal is identical to that used by the trial court: a motion for
summary judgment should be granted where there is no genuine issue as to any material fact and the
moving party is entitled to judgment as a matter of law. Id.
In cases involving commercial contracts negotiated at arm’s length, a plaintiff claiming fraud
must establish by clear and convincing evidence that, inter alia, “the defrauded party’s reliance [was]
reasonable.”4 Hercules & Co. v. Shama Rest. Corp., 613 A.2d 916, 923 (D.C. 1992) (emphasis in
original). Because we hold that under these facts, CUIC failed to show that its reliance was
reasonable, we affirm the trial court’s grant of summary judgment.5
4
The remaining elements are a false representation, in reference to material fact, with
knowledge of its falsity, and an intent to deceive. Atraqchi v. GUMC Unified Billing Servs., 788
A.2d 559, 563 (D.C. 2002).
5
The District also claims that DHCD never intended to deceive CUIC. Because, as we
explain below, CUIC’s reliance could not have been reasonable, we need not address the “intent”
element of the fraud claim.
6
In light of the principles now codified at 31 U.S.C. § 1341,6 the Supreme Court of the United
States and other federal courts have explicitly and repeatedly held that all contracts for future
payments of money, in advance of or in excess of existing appropriations, are void ab initio.
Hercules Inc. v. United States, 516 U.S. 417, 427 (1996); Goodyear Tire & Rubber Co. v. United
States, 276 U.S. 287 (1928); Leiter v. United States, 271 U.S. 204 (1926); see, e.g., E.I. du Pont de
Nemours & Co. v. United States, 365 F.3d 1367, 1374 (Fed. Cir. 2004); RCS Enters. v. United States,
57 Fed. Cl. 590, 594 (2003).
CUIC claims that the Act is inapplicable here because ample HUD “block grant” funds were
available to DHCD in 1999, when CUIC attempted to exercise the ¶ 3(e) provisions.7 Therefore,
urges CUIC, appropriations were unnecessary; the District merely had to distribute some of the HUD
entitlement monies to DHCD so that the agency could purchase the Note and Deed. However, this
6
The Act provides that “[a]n officer or employee of the United States Government or of the
District of Columbia government may not make or authorize an expenditure or obligation exceeding
an amount available in an appropriation or fund for the expenditure or obligation,” 31 U.S.C. § 1341
(A), or “involve either government in a contract or obligation for the payment of money before an
appropriation is made unless authorized by law.” 31 U.S.C. § 1341 (B). See also D.C. Code
§ 1-204.46 (“no amount may be obligated or expended by any officer or employee of the District of
Columbia government unless such amount has been approved by Act of Congress, and then only
according to such Act”); D.C. Code § 47-355.02. Notwithstanding passing references to 31 U.S.C.
§ 1341 in Sullivan v. District of Columbia, 829 A.2d 221 (D.C. 2003), Atchison v. District of
Columbia, 585 A.2d 150 (D.C. 1991), Barry v. Bush, 581 A.2d 308 (D.C. 1990), and Convention
Ctr. Referendum Comm.v. District of Columbia Bd. of Elections & Ethics, 441 A.2d 889 (D.C.1981),
this is the first case in which we have had occasion to apply the statute in depth and on the merits.
7
Under the United States Department of Housing and Urban Development’s Housing and
Community Development Act of 1974, 42 U.S.C. §§ 5301-5321, the District is statutorily entitled
to multi-million dollar, blanket appropriations from Congress. Id. at § 5306 (a)(3). The District then
spends these HUD “block grants” as it sees fit, subject only to broad federal requirements. See id.
at § 5301.
7
line of reasoning evinces a fundamental misunderstanding of 31 U.S.C. § 1341. Paragraph 3(e)
promised a payment whose amount would be determined solely by CUIC at some future, unspecified
date (if ever), but no sooner than 18 months after the signing of the Agreement. Because the ¶ 3(e)
option could not be exercised within the current fiscal year in which the Agreement was signed, it
was voided by the 31 U.S.C. § 1341 (a)(1)(B) prohibition on any “payment of money before an
appropriation is made.”
With certain exceptions not relevant here, the government must
affirmatively reauthorize its multi-year contracts on an annual basis. Goodyear Tire & Rubber Co,
supra, 276 U.S. at 291-92; Leiter, supra, 271 U.S. at 207; see also Lee by Lee v. United States, 124
F.3d 1291, 1295 (Fed. Cir. 1997) (under 31 U.S.C. § 1502, “funds appropriated for one year may not
be used for needs of another subsequent year”); Solar Turbines Int’l v. United States, 3 Cl. Ct. 489,
495 (1983) (“Congress appropriates funds for only a single year’s obligations, and the
Anti-Deficiency Act prohibits anyone from obligating the government in excess of the dollars
appropriated by Congress” (footnote omitted)). Here, the record reveals that funds were never
appropriated to comply with the Agreement in 1985, and it is undisputed that no such appropriation
was made against available funds in 1999.
Moreover, because ¶ 3(e) was never valid in the first place, the existence vel non of any
subsequent HUD funds is irrelevant.8 A contract will only bind the government in subsequent years
8
CUIC’s related argument – that 31 U.S.C. § 1341 is inapplicable to this case because the
parties had anticipated that the funding would come from HUD block grants, as opposed to directly
from Congress – also fails. See note 7, supra. Tracing the block grant funding one step further back
reveals that, though Congress may use HUD as a conduit to allocate funds to the District’s housing
needs, all of the funds originally derive from the legislature’s purse. 42 U.S.C. § 5306 (a)(3).
Hence, the rationale for enforcing 31 U.S.C. § 1341 applies with equal force to the case at bar. See
Cessna Aircraft Co. v. Dalton, 126 F.3d 1442, 1448-49 (Fed. Cir. 1997).
8
if appropriations are made in those “out years,” and if the government affirmatively renews the
contract. Goodyear Tire & Rubber Co., supra, 276 U.S. at 291-92 (1928); Leiter, supra, 271 U.S.
at 207; see also Union Pac. R.R. Corp. v. United States, 52 Fed. Cl. 730, 734-35 (2002). Here,
neither condition was present, and ¶ 3(e) is, therefore, void ab initio.9
CUIC’s reliance on the express warranty at ¶ 5(c) is also unavailing. In accordance with
Supreme Court case law, this court has repeatedly held that one who contracts with a government
agent is constructively notified of the limits of that agent’s authority, and any reliance on contrary
representations cannot be reasonable. Leonard v. District of Columbia, 801 A.2d 82, 86 (D.C.
2002); District of Columbia v. Greene, 806 A.2d 216, 222 n.7 (D.C. 2002) (“persons dealing with
a municipal corporation through its agent are bound to know the nature and extent of the agent’s
authority”) (quoting Coffin v. District of Columbia, 320 A.2d 301, 303 (D.C. 1974)); Chamberlain
v. Barry, 606 A.2d 156, 159 (D.C. 1992); Strong v. District of Columbia, 1 Mackey 265 (D.C. Cir.
1881). See also Federal Crop Ins. Corp. v. Merrill, 332 U.S. 380 (1947).10
9
In this respect, the cases on which CUIC relies are inapplicable, as they involved contracts
which were initially valid. Cherokee Nation v. Leavitt, 543 U.S. 631, 634 (2005); Massachusetts
Bay Transp. Auth. v. United States, 129 F.3d 1226, 1231 (Fed. Cir. 1997); Wetsel-Oviatt Lumber Co.
v. United States, 38 Fed. Cl. 563, 570 (1997); In re All Asbestos Cases, 603 F. Supp. 599, 612 n.6
(D. Haw. 1984); Ferris v. United States, 27 Ct. Cl. 542, 546 (1892); Dougherty v. United States, 18
Ct. Cl. 496, 503 (1883). Also distinguishable is New York Airways, Inc. v. United States, because
it addressed “a Government obligation created by statute” and the “unless authorized by law”
exception to the Act, at 31 U.S.C. § 1341 (B). 369 F.2d 743, 748 (Ct. Cl. 1966). Here, CUIC
contends neither that the District is statutorily obliged to honor the Agreement, nor that the § 1341
(B) exception applies.
10
Hence, CUIC’s citations to Cassidy v. Owen, 533 A.2d 253 (D.C. 1987), and Mills v.
Cosmopolitan Ins. Agency, Inc., 424 A.2d 43 (D.C. 1980), are inapposite. Whether an agent had the
apparent authority to bind a principal is generally a question of fact. Makins v. District of Columbia,
861 A.2d 590, 594 (D.C. 2004) (apparent authority may arise when third person reasonably believes
(continued...)
9
A government agent cannot validate a contract merely by averring that she is authorized to
enter it, if no such authority exists; the rule applies with equal force even if “the agent himself may
have been unaware of the limitations upon his authority.” Merrill, supra, 332 U.S. at 384. To
permit otherwise would eviscerate the very purpose of the Act. Cessna Aircraft Co. v. Dalton, 126
F.3d 1442, 1448-49 (Fed. Cir. 1997) (Anti-Deficiency Act intended to halt practice by which
“[government] officials were obligating funds before they were appropriated by Congress, and then
making deficiency requests for appropriations that Congress had little choice in deciding because
government agencies had basically committed the United States to make good on its promises”);
Lopez v. Johns Manville, 649 F. Supp. 149, 158 (D. Wash. 1986), aff’d by Lopez v. A.C.&S., Inc.,
858 F.2d 712 (Fed. Cir. 1988) (“purpose of the statute is to prohibit anyone from obligating the
Government in excess of the dollars appropriated by Congress”). Therefore, as a matter of law, it
was not possible for CUIC to prove the reasonable reliance necessary to prevail on a claim of fraud.
Shama Rest. Corp., supra, 613 A.2d at 923.11
10
(...continued)
that the principal had consented to agent’s exercise of authority). However, a private party’s
transactions with the government present an exception to this rule, insofar as the issue of whether
a contractor’s reliance on a government agent’s professed authority was reasonable becomes a
question of law. See Greene, 806 A.2d at 222; Merrill, 332 U.S. at 384; Pia v. United States, 7 Ct.
Cl. 208 (1985), aff’d, 818 F.2d 876 (Fed. Cir. 1987) (“The doctrine found in agency law of apparent
authority does not apply to the government”).
1
2
3
11
Because we affirm on the same bases as did the Superior Court, we need not address the
District’s alternative argument that D.C. Code § 12-309 precluded CUIC’s fraud claim.
10
IV.
Because the Agreement was void ab initio, and because CUIC was constructively notified
that the DHCD officials were never authorized to bind the District to the Agreement, the trial court’s
grant of summary judgment to the District is
Affirmed.
SCHWELB, Associate Judge, concurring: To the limited extent that a lawsuit can be deemed
a morality play, this one does not come out right. Because I believe that I am required to do so by
statute and precedent -- and only for that reason -- I concur in the judgment of the court, and I join
the court’s opinion as far as it goes. I agree that summary judgment in favor of the District must be
affirmed, for two of the District’s ranking officials lacked the authority to bind the District when they
deliberately or recklessly made significant misrepresentations of fact and law to the plaintiff. This
is so even though these officials almost certainly knew, and indisputably should have known, that
their assurances were false.
Nevertheless, the blithe and unapologetic tone in which the District now defends its reneging
on the promises on which the plaintiff relied to its1 very substantial detriment strikes me as an
1
I refer to the plaintiff as neuter because the underlying dispute is between the contractor
(continued...)
11
embarrassment to the District and its citizens. Invoking the Anti-Deficiency Act to avoid paying
money under a contract “proves to U.S. industry that the Government is an unreliable contracting
partner that will make promises and then do everything in its power not to honor them.” The AntiDeficiency Act: A “Normal” Government Defense?, 17 No. 12 Nash & Cibinic Rep. 63 (Dec. 2003).
After Williams v. District of Columbia, a contractor can hardly be faulted if he or she is a trifle
cautious about accepting assurances from officials of the District of Columbia government.2
The 1985 Tri-Party Agreement on which the plaintiff’s case is founded included the
following representation of historical fact:
Insofar as legally required, [the District] has committed sufficient
funds to satisfy its obligations under the Agreement and will insure
that such funds remain available for such purpose until required to be
expended in accordance with the provisions hereof or until such
obligations are otherwise satisfied or discharged.
(Emphasis added.) The officials of the District who made this representation included a Deputy
Corporation Counsel, who was the chief negotiator for the District, and the Director of the District’s
Department of Housing and Community Development (DCHD), who signed the agreement on behalf
of the District. In fact, the District had not committed sufficient funds for this project; indeed, this
1
(...continued)
and the District of Columbia.
2
The false or reckless promises which formed the basis for this suit were made several
administrations ago, but as recently as 2005, counsel for the District asserted in its brief and in oral
argument, without the slightest indication of embarrassment, that the plaintiff is out of luck because
it believed the District’s officials’ solemn representations.
12
was a multi-year contract and the funds could not have been appropriated for it in advance.
Nevertheless, a high-ranking legal official in the District government and the head of DCHD assured
the plaintiff that the District’s obligations had been fully funded, when they had not.
In the Tri-Party Agreement, the District also represented the following:
(2)
“[i]nsofar as legally required,” the District “will insure that
such funds remain available for such purpose until required to
be expended in accordance with the provisions hereof or until
such obligations are otherwise satisfied or discharged” . . . ;
(3)
the Tri-Party Agreement has been “duly authorized” . . . ;
(4)
the Tri-Party Agreement “constitute[s a] valid and legally
binding obligation enforceable against [the District] in
accordance with [its] terms” . . . ; and
(5)
DCHD’s “execution of,” “performance pursuant to,” and
“provisions of” the Tri-Party Agreement “will not result in the
breach or violation of any provision of any statute . . . to
which [the DCHD] is subject” . . . .
(Citations to appendix omitted.) But all of these representations, the District now says, were
unauthorized, and, according to the District, the plaintiff had no right to rely upon them and acted
unreasonably in doing so. Another way of putting the proposition now advanced by the District is
that any reasonable person or business entity in the plaintiff’s position should have assumed that a
Deputy Corporation Counsel and the head of DCHD were either lying or did not know what they
were talking about, or perhaps both.
13
As the plaintiff points out in its brief, the District does not dispute -- indeed, its litigation
strategy has been to herald the fact -- that the above-described representations were categorically
false at the time its high-ranking officials made them. The District had not only failed to commit
“sufficient funds” to satisfy its obligations under the Tri-Party Agreement, but it had not committed
any funds to the project. Years after solemnly assuring the plaintiff that the contrary was the case,
the District now asserts that the agreement had not been duly authorized, and that it was not then,
and is not now, a valid and binding obligation. Although the District represented in this agreement
that performance of its obligations thereunder “will not result in the breach or violation of any
statute” to which DCHD was subject, the District now asserts, in stark contrast to the foregoing
assurance, that if it were to carry out the promises it made to the plaintiff, this would run afoul of the
Anti-Deficiency Act and comparable provisions of District of Columbia law.
The plaintiff claims that, as a result of the District’s breach, it has received three payments
totaling only $2.1 million of approximately $14 million repayable under its loans. It is out-of-pocket
to the tune of millions of dollars because it trusted the word of District officials when the District
now says, correctly as a matter of law, that these officials’ solemnly given word was not to be
trusted. As the court points out, one who contracts with a government agent is constructively
notified of the limits of that agent’s authority, and cannot reasonably rely on representations to the
contrary. Maj. op., ante, at p. 8. “Congress appropriates funds for only a single year’s obligations,
and the Anti-Deficiency Act prohibits anyone from obligating the government in excess of the
dollars appropriated by Congress.” Maj. op., ante, at p. 7 (citation omitted). I therefore cannot
quarrel with the result that the trial judge and this court have reached.
14
The assurances in this case were not provided to the plaintiff by a low-ranking contracting
agent, but by a Deputy Corporation Counsel and by the head of the relevant Department of the
District’s government. At the very least, the District’s current officials might be expected to express
some regret over the false representations made by their predecessors and to apologize to the party
that relied on their predecessors’ words. They might also be expected to provide credible assurances
to the citizens of the District, and to those who do business with the District’s government, that the
conduct revealed in this record will not be repeated.3 Surely honor should play some role in the
District’s dealings with its contractors.4
Sovereign immunity and related doctrines are all descended from the ancient belief in the
divine right of kings and from the patent canard, exposed as such over many centuries of history, that
the king can do no wrong. In some measure, these doctrines are still needed today to protect the
public fisc. In this case, however, it is not much of an exaggeration to say that the liar is faulting the
victim for having believed his lies. However diplomatically one might wish to phrase it, this is the
underlying truth about the present dispute. Before Williams v. District of Columbia becomes history,
3
That, in my view, is not the tone reflected in the District’s brief in this case.
4
In my opinion, the following commentary fits the situation before us to a “T”:
Using a contract clause that leads the contractor to believe that
Government is going to indemnify it and then defending against the
contractor’s claim on the grounds that the clause is illegal is not fair
dealing. We know that Government contractors are supposed to
know all of the legal rules and protect themselves, but the
Government also has an obligation not to play shell games in the
contracting process.
Recovering in the Face of an “Illegal” Indemnification Clause: Ingenious Solutions? 16 No. 11
Nash & Cibinic Rep. 54 (Nov. 2002).
15
this truth should be recorded for posterity, even if only in the Atlantic Second Reporter.
NEBEKER, Senior Judge: As author of the court’s opinion, it is my duty to state the law as
it is and the result dictated by that law. That said, I am constrained to state that I am in complete
agreement with Judge Schwelb that the behavior of the District of Columbia officials in 1985 in the
matter was highly unprofessional and disgraceful. Indeed, in my judgment, that conduct was official
action “which would adversely affect the confidence of the public in the integrity of the District
government.” See D.C. Personnel Regulations, Chapter 18, Part I, § 1800.1.